BARRY (DDG 52)
PROJECT INSTALL AVAIL WORK SCOPE SURVEY STATUS
FY 18 SRA4-2   11/07/2017 - 06/11/2019 1 / 75 (b)   2 / 14 (f) 02/16/2015 Complete
  FY 24 DSRA4   02/05/2024 - 07/19/2025 12 / 36 (b)   9 / 34 (f) 06/25/2007 Active

 

S H I P    H A B I T A B I L I T Y    P R O J E C T    D A T A
BARRY (DDG 52) 21660-242
ACTIVE PROJECT
TYCOM: SURFPAC HOMEPORT: SEATTLE PLANNING YARD: BATH
POC: Steve Ferderer, CNSP N43 PHONE: 619-437-3795
ENGINEERING WORK SCOPE
SURVEY AVAILABILITY: FY 07 PIERSIDE
SURVEY DATES: 06/25/2007 - 07/25/2007
SURVEY LOCATION: NORVA
DESIGN AGENT: DELPHINUS
INSTALLATION WORK SCOPE
INSTALL AVAILABILITY: FY 24 DSRA4
INSTALL DATES: 02/05/2024 - 07/19/2025
INSTALL LOCATION: EVER
SHIPYARD:
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 6 / 102 0 / 0 0 / 0 0 / 0 6 / 102
SANITARY SPACE / FIXTURES: 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 0 / 0 0 / 0 0 / 0 12 / 36 12 / 36
SANITARY SPACE / FIXTURES: 8 / 29 0 / 0 0 / 0 1 / 5 9 / 34
OTHER PROJECT:
PROJECT NO(S): BENL-E7093, HENL-E7255
REMARKS:
OTHER PROJ:
REMARKS: CREW SANITARY COMPLEX 2,4,5,& 6

OFFICER BERTHING AND OFFICER SANITARY SPACE WILL USE SHIPALT DDG-51-81670 D DRAWINGS
Original APN issued 09/05/2018; Original PCN received 09/27/2018. APN RE-ISSUED 1/4/22.
HABITABILITY DRAWING NUMBERS
DISCIPLINE HAB DRAWING NUMBER NAVSEA DRAWING NUMBER
ARRANGEMENT-SANITARY 03-DDG 52-03  H 644 - 7278101  REV H
VENTILATION-SANITARY 03-DDG 52-12  H 512 - 7278103  REV H
PIPE-SANITARY 03-DDG 52-20  H 505 - 7278104  REV H
ELECTRICAL-SANITARY 03-DDG 52-32  H 331 - 7278105  REV H
VENT MFG DET (52) NOT REQUIRED FOR HENL PROJECT.
OFFICER BERTHING AND OFFICER SANITARY SPACE WILL USE SHIPALT DDG-51-81670 D DRAWINGS
PROJECT NUMBERS(s) AND COMPARTMENTS
BOFF-S
02-126-1-L (3)
02-126-2-L (3)
02-136-1-L (3)
02-136-2-L (3)
02-145-1-L (3)
02-145-2-L (3)
02-158-7-L (3)
1-314-2-L (3)
1-322-2-L (3)
1-330-4-L (3)
1-346-2-L (3)
1-356-2-L (3)
 PT 12 (36)
HENL-S9396
3-97-01-L (9)
3-102-1-A (1)
3-300-2-L (5)
3-306-2-A (1)
3-325-1-L (6)
3-335-1-A (1)
3-338-3-A (1)
3-338-5-L (5)
 PT 8 (29)
HOFF-S
1-338-6-L (5)
 PT 1 (5)
MILESTONES SCHEDULED ACTUAL EVENTS
04/07/2022 06/25/2007 06/25/2007 START SURVEY
05/06/2022 07/25/2007 07/25/2007 COMPLETE SURVEY
06/07/2022 05/23/2008 05/23/2008 SEND SURVEY REPORT TO PM
10/13/2022 12/30/2021 01/04/2022 TC ISSUE ADVANCE PLANNING NOTICE TO SHIP
11/10/2022 02/04/2022 Pending SHIP RESPOND TO ADVANCE PLANNING NOTICE
12/12/2022 04/17/2020 04/28/2020 SO SUBMIT DRAWINGS TO PM & PY
12/12/2022 04/17/2020 04/29/2020 SO DELIVER PROCUREMENT INFORMATION PACKAGE TO PM
08/09/2023 08/09/2023 Pending PROJECT MATERIAL PROCUREMENT FUNDED
11/06/2023 11/06/2023 Pending PROJECT INSTALLATION FUNDED
02/05/2024 02/05/2024 02/05/2024 START AVAILABILITY
02/05/2024 02/05/2024 02/05/2024 START PROJECT
07/19/2025 07/19/2025 Pending COMPLETE PROJECT
07/19/2025 07/19/2025 Pending COMPLETE AVAILABILITY
Project Record Last Updated: 04/09/2024