PROJECT INSTALL AVAIL WORK SCOPE SURVEY STATUS
FY 16 DSRA1   11/09/2015 - 10/05/2016 3 / 42 (b)   8 / 38 (f) NA Complete
FY 22 SRA2-2   01/17/2022 - 12/08/2022 1 / 93 (b)   3 / 20 (f) 04/03/2013 Complete
FY 22 SRA2-2   01/17/2022 - 12/08/2022 3 / 36 (b)   4 / 12 (f) 07/11/2017 Complete
FY 22 SRA2-2   01/17/2022 - 12/08/2022 3 / 45 (b)   4 / 13 (f) NA Complete
  FY 24 DMP1   09/23/2024 - 11/11/2026 1 / 87 (b)   2 / 15 (f) 04/03/2013 Active
FY 24 DMP1   09/23/2024 - 11/11/2026 4 / 27 (b)   5 / 17 (f) 03/01/2022 Active
FY 28 DMP2   09/25/2028 - 11/28/2030 16 / 37 (b)   13 / 32 (f) 10/01/2024 Active
FY 33 SRA3-1   05/05/2033 - 12/28/2033 2 / 141 (b)   5 / 30 (f) 09/25/2028 Active

 

S H I P    H A B I T A B I L I T Y    P R O J E C T    D A T A
HALSEY (DDG 97) 23154-244A
ACTIVE PROJECT
TYCOM: SURFPAC HOMEPORT: SDGO PLANNING YARD: BATH
POC: Steve Ferderer, CNSP N43 PHONE: 619-437-3795
ENGINEERING WORK SCOPE
SURVEY AVAILABILITY: FY 13 SRA1-3
SURVEY DATES: 02/27/2013 - 08/06/2013
SURVEY LOCATION: PEARL
DESIGN AGENT: DELPHINUS
INSTALLATION WORK SCOPE
INSTALL AVAILABILITY: FY 24 DMP1
INSTALL DATES: 09/23/2024 - 11/11/2026
INSTALL LOCATION: SDGO
SHIPYARD:
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 2 / 180 0 / 0 0 / 0 0 / 0 2 / 180
SANITARY SPACE / FIXTURES: 5 / 35 0 / 0 0 / 0 0 / 0 5 / 35
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 1 / 87 0 / 0 0 / 0 0 / 0 1 / 87
SANITARY SPACE / FIXTURES: 2 / 15 0 / 0 0 / 0 0 / 0 2 / 15
OTHER PROJECT:
PROJECT NO(S): BENL-E3378, HENL-E3388
REMARKS: REV C DRWAINGS ISSUED 08/14/2023. DRAWINGS WILL BE RE-ISSUED AS REV D WITHOUT CREW SANITARY SPACE 3-97-01-L. REV C NOT INSTALLED.
OTHER PROJ: INSTALL WITH 23154-244B
REMARKS: CREW COMPLEXES #1
SHIP REQUESTED ADDITIOAL BOFF & HOFF SPACES TO BE INCLUDED IN WORK SCOPE.
BOFF / HOFF WIL BE SURVEYED FY 24 AND SCHED FOR INSTALLED IN FY 28.
HABITABILITY DRAWING NUMBERS
DISCIPLINE HAB DRAWING NUMBER NAVSEA DRAWING NUMBER
ARRANGEMENT-BERTHING 15-DDG 97-01  D 640 - 8565827  REV D
ARRANGEMENT-SANITARY 15-DDG 97-03  D 644 - 8565830  REV D
VENTILATION-BERTHING 15-DDG 97-10  D 512 - 8565828  REV D
VENTILATION-SANITARY 15-DDG 97-12  D 512 - 8565831  REV D
PIPE-SANITARY 15-DDG 97-20  D 505 - 8565832  REV D
ELECTRICAL-BERTHING 15-DDG 97-30  D 331 - 8565829  REV D
ELECTRICAL-SANITARY 15-DDG 97-32  D 331 - 8565833  REV D
VENTILATION-MFG DET 15-DDG 97-52  D 512 - 8565834  REV D
REV C NOT INSTALLED.. DRAWINGS WILL BE RE-ISSUED AS REV D WITHOUT CREW SANITARY SPACE 3-97-01-L.
PROJECT NUMBERS(s) AND COMPARTMENTS
BENL-S4417
2-78-01-L (87)
 PT 1 (87)
HENL-S4419
2-97-01-L (14)
2-102-1-A (1)
 PT 2 (15)
MILESTONES SCHEDULED ACTUAL EVENTS
11/23/2022 04/03/2013 04/03/2013 START SURVEY
12/23/2022 04/08/2013 04/08/2013 COMPLETE SURVEY
01/24/2023 05/08/2013 04/30/2013 SEND SURVEY REPORT TO PM
06/01/2023 06/01/2023 06/30/2023 TC ISSUE ADVANCE PLANNING NOTICE TO SHIP
06/30/2023 06/30/2023 07/18/2023 SHIP RESPOND TO ADVANCE PLANNING NOTICE
07/31/2023 02/16/2024 03/20/2024 SO SUBMIT DRAWINGS TO PM & PY
07/31/2023 02/16/2024 03/20/2024 SO DELIVER PROCUREMENT INFORMATION PACKAGE TO PM
09/23/2024 09/23/2024 09/23/2024 START AVAILABILITY
09/23/2024 09/23/2024 09/23/2024 START PROJECT
11/11/2026 11/11/2026 Pending COMPLETE PROJECT
11/11/2026 11/11/2026 Pending COMPLETE AVAILABILITY
Project Record Last Updated: 09/23/2024